1. Deburring treatment before concrete waterproofing:
Surface laitance(floating slurry) removed, to make preparation to the next step paving and painting of various materials.
Clean up old concrete pavement.
Clean up flag line and the old coating.
Clean up the plastic and line of airport runaway.
Restore skid resistance.
- Asphalt:
Clean up the surface attachments,to make preparation for the thin layer.
Surface roughening, surface treatment before the various functional pavement.
Cleaning and maintenance of airport runaway.
Restore skid resistance.
3. Steel:
Clean up steel plate surface, steel structure
Clean up engineering machinery, bridge building
Clean up colored pavement.
working process:
1.The impeller operates at high speed, ejection projectile to the part to be processed, to achieve the effect of removing rust and polishing. The Angle, speed, power, and roughness of ejection can be regulated.
2. The steel shots blasted by blasting turbines will be collected, purifying by shots circle system and continue to be used again for blasting turbines.
- The working process flow of shots circle system: steel shots blasted by blasting turbines will be collected by portrait screw conveyor and delivered to bucket elevator then the bucket elevator will lift to air wash type separator.