- Working Process:
- Sample: R&D department control sample process directly. Save time and directly adjust working process. Sample time: 7-10days.
-
Production: R&D department finish working process drawing. Production department proceeding and IPQC proceeded. QC/Package department check final quality and finish package together.
-
All shipped pats are almost 100% checked by QC/Package department.
- Equipment:
*Equipment: laser cutting, cnc punch machine, bending, stamping machines, spot welding, arc welding, laser welding etc.
3.Quality Control Process
In-come material checking
Quality controal in processing(IPQC). 2 QC worker checking during production every day.
- Final quality control during package(FQC).