Place de provenance : UPV

Training: Staff management (technical and construction)

Profil : Prestataire de Service | Réf : PSL368981YH | Pays : France | Devise : EUR | Incoterm : | Export : Non | Import : Non

Personnel management (technical and construction): Prevention of the risk of asbestos in the work of maintenance and renovation under section IV

training in accordance with the Decree of February 23, 2012
recycling to be carried out no later than 3 years after the initial training

objectives:
-know the specific operations of the activity that may cause the release of asbestos fibres and exposure levels and induced dust.

  • being able to define procedures adapted to work on asbestos-containing materials.
  • know the General principles of ventilation and dust collection at the source.
  • on the basis of the results of the assessment of risks and the locations, being able to establish a modus operandi integrating, as appropriate, in a prevention plan or a PPSPS and to enforce.
  • being able to apply and enforce procedures adapted to the interventions on materials containing asbestos;
  • being able to apply and enforce a procedure.
  • being able to balance a ventilation.

    Prerequisites:
    reading speak understand and write the french
    Presentation to the inclusion by the employer, of a document certifying the medical fitness at the workplace of the employee, issued by the occupational physician of the company (specificities relating to the wearing of respiratory protective equipment).

    Pedagogy:
    presentations - classroom (briefing, questions answers, exercises)
    Video projector
    movie video

    practical applications case studies intern Documentation on site school.

    Public type:
    employer, or person responsible within society at the level of technical and commercial decision-making, studies, organization and implementation of specifications and the technical means.
    Responsible staff of the monitoring of the construction.

    Assessment methods:
    a written assessment of trainees will take place at the end of training.
    That will allow the trainer to give an assessment of fitness and a certificate of competence to the trainee.

    Detailed rules for assessment of skills performed in two stages:
    •Evaluation of 45 minutes in the form of questionnaire to multiple choice or short answer common to personal site framing or framing Technique
    •Evaluation practice 2 hours minimum from a different for the personal site framing or framing technical case study

Type de l'annonce : Offre de produit

Référence de l'annonce : PSL368981YH

Référence de l'annonceur : REF-169589

Prix : 1-

Devise : EUR

Quantité minimum d'achat : 1

Catégorie: Other education and training services

Mots clés : training | asbestos | personal | management | construction | work

Autres annonces de l'annonceur qui peuvent vous intéresser

Pourquoi importer avec Golden-Trade ?

Acheter à l'international n'a jamais été aussi simple et sûr :

Un interlocuteur unique

Un interlocuteur unique
du début à la fin

Une interface simple

Une interface simple
pour suivre vos opérations

Une gestion de bout en bout

Logistique "porte à porte"
on vous livre où vous le voulez

Une police d’assurance garantie de bonne fin

Garantie de bonne fin
jusqu'à 7,5 millions €

Crédit import

Crédit import
Achetez maintenant et payez dans 180 jours max *sous conditions