They consist of two buildings for lift trucks which run on normal track. The construction ensures travel in a straight line, crossing the crossing. Seal lift-away serves handling bogie wagons removed from the plant site. Applicability - raising several points lining subway / train. 1 winch can lift / pairs / all at once. Manufacture and assembly ridicătoarelor group is selected according to the EU regulations in force relating to devices for lifting vehicles, with completion of all checks provided. Linkage group will be used for dismantling - replacing wheel groups and major subassemblies of railway vehicles in the performance of maintenance work. The winches are ordered from control desks on either piece in hand, and common command from the central console from one of winches, they can enter the system working in the system. Lifting group is synchronized - aims diagnostics system that protects supraâncărcării smoothness. Raising automatically pauses if a component is overloaded (EN-954-1, control category 3). Display with touch screen central control unit displays the data status, pregnancy, and position errors.